Two products. Both include software and hardware. The difference is ready-made content or a replica of your own crane.
What happens in a session, what the operator trains on, and what the trainer sees afterwards.
An EAF crane simulator is a replica of the cranes in an electric arc furnace bay: the scrap charging crane, the ladle crane and the work at the furnace. Operators train every lift in the simulator first, so the first time on the real crane is a confirmation, not a lesson.
To cut CO₂, steel plants are replacing blast furnaces and converters with electric arc furnaces. An EAF melts scrap, or direct reduced iron, with electricity instead of coal. In the United States about 70% of steel already comes from EAFs. In Europe about 55% still comes from the blast furnace route and 45% from the EAF, and that share is moving towards the EAF.
For crane operators it is a new job. A new bay, new cranes and different loads: scrap baskets instead of hot metal from the blast furnace, and tapping at the furnace itself. Often the controls change too.
The new cranes are usually commissioned shortly before the first heat. There is little time to train on them, and no crane in the plant that is like them.
Sources: Global Energy Monitor 2026, Global Energy Monitor 2025, Fastmarkets, EurekAlert
Ask for a training audit. We look at your future EAF bay, your cranes and your operators, and what they need to be ready before the first heat.
The replica is built from drawings and models, so training can start during construction.
Once the EAF runs, the crane is rarely free for practice. The simulator is.
Collisions, hard landings and emergencies are trained where they cost nothing.
Algoma Steel is moving from integrated steelmaking to an electric arc furnace. None of the existing cranes in the plant matched the new EAF cranes, so operators trained on a replica built from Algoma's own models while the facility was still under construction.
"The simulator helps us shorten the learning curve, enabling operators to be competent from day one."
Jon Whittington · General Manager, EAF Operations · Algoma Steel
Read the full caseEvery mission is scored when it ends. Trainers see per run where the operator lifted safely and where a habit still needs work.
Every contact between the load, the crane and the bay, weighted by severity.
How far the load swings away from vertical, measured in degrees throughout the run.
One movement at a time. Movements driven together show up in the score.
Time per mission, next to the other scores. Fast never outranks safe.
These four metrics are part of the performance metrics every session logs. Want to know more about it? Get in touch.
Short answers. If yours is not here, ask it directly and you get a reply from someone who has run the rollout.
Talk to usYes. The replica is built from the plant's drawings and models, so training can start while the facility is still under construction. Algoma Steel trained its operators this way before its EAF went live.
The cranes in the EAF bay: scrap charging with the scrap basket, ladle transport, and tapping and pouring at the furnace. In a Premium project the replica follows your own cranes and your own bay.
An EAF crane course for Academy is in development, built together with the industry. Ask for the roadmap through the contact form and we share the planned content and timing.
In a Premium project, yes. The rig is built with the same controls and layout as your crane.
Your drawings of the crane, the bay and the process. Our team builds the replica from them, so operators train in the environment they will work in.